TM 5-3895-374-10
Item
Procedure
17
Re-install the two conveyor support pins into their location at the rear of
the chassis.
18
Reconnect the air brake lines and transport light cables that have
connections in the drive through area. These hoses and cables are
stored on the lower position of the chassis.
19
Bolt the feed hopper onto the rear of the main chassis for transport.
20
Fold all ladders for transport.
21
Extend the landing jacks to their maximum.
22
Position the hydraulic power pack and connect the hoses to the levelling
jack valve.
23
Using the hydraulic power pack extend the levelling jacks raising the
chassis off the ground.
24
Remove the pads from the screw jacks and store the pads and legs in
the transport position.
25
Adjust the screw jacks on the front and rear support bases by raising the
jacks.
26
Fully retract the hydraulic levelling jacks.
27
Disconnect the hydraulic power pack.
28
Using the surge bin hydraulic system, slightly extend the two rear
cylinders mounted on rear support base enough to remove the two pins
holding the support base the main chassis.
29
Retract the two rear cylinders until the pins can be reinserted. Lock the
pins in place by re-inserting the clip pins.
30
Slightly extend the two front cylinders mounted on front support base
enough to remove the two pins holding the support base to the main
chassis.
31
Retract the two front cylinders until the pins can be re-inserted. Lock the
pins in place by re-inserting the clip pins.
32
Disconnect all control and power cables and store for transport.
33
Connect the transport tractor and move the surge bin as desired.
page 2 - 65