TM 5-3895-374-10
9.Hydraulic Power Pack Tear Down Procedures
(See Figure 2-3 and 2-7)
Item
Procedure
1
Secure the power cable on the unit.
2
Store on the control van goose neck.
10.Generator Trailer Tear Down Procedures
(See Figure 2-5)
Item
Procedure
1
Turn generator off.
2
Remove the power cables from the motor control centers #1 and #2.
Store the cables on the generator trailer.
3
Remove the ground wires connected from the generators to the ground
rods. Remove ground rods.
4
Raise the trailer using the landing legs so that the weight is removed from
the screw levelling legs.
5
Remove the pads from the screw levelling legs and stow the pads and
legs in the transport position.
6
The trailer will be supported by the wheels and landing legs.
7
Connect the transport tractor and move the generator trailer as desired
11.Standby Generator Tear Down Procedures
Item
Procedure
1
Turn generator off.
2
Remove the power cable from the motor control center. Remove the
other end of the cable at the 60 kW generator. Store the cable on the
generator trailer.
3
Remove the ground wire connected from the generator to the ground rod.
Remove ground rod.
page 2 - 66