TM 5-3895-374-109.Hydraulic Power Pack Tear Down Procedures(See Figure 2-3 and 2-7)ItemProcedure1Secure the power cable on the unit.2Store on the control van goose neck.10.Generator Trailer Tear Down Procedures(See Figure 2-5)ItemProcedure1Turn generator off.2Remove the power cables from the motor control centers #1 and #2.Store the cables on the generator trailer.3Remove the ground wires connected from the generators to the groundrods. Remove ground rods.4Raise the trailer using the landing legs so that the weight is removed fromthe screw levelling legs.5Remove the pads from the screw levelling legs and stow the pads andlegs in the transport position.6The trailer will be supported by the wheels and landing legs.7Connect the transport tractor and move the generator trailer as desired11.Standby Generator Tear Down ProceduresItemProcedure1Turn generator off.2Remove the power cable from the motor control center. Remove theother end of the cable at the 60 kW generator. Store the cable on thegenerator trailer.3Remove the ground wire connected from the generator to the ground rod.Remove ground rod.page 2 - 66
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business