TM 5-3895-374-10
Item
Procedure
11
Install the red pipe cap onto the overflow/vent pipe on the hot oil heater.
12
Connect the transport tractor and move the asphalt tanker as desired.
6.
Baghouse Tear Down Procedures
(See Figure 2-16)
Item
Procedure
1
Remove any dust from the system by purging the system prior to shut
down.
2
Disconnect all control and power cables and store on brackets provided.
3
Disconnect the blower hose from the drum mixer and from the baghouse.
Store in the basket on the drum meter.
4
Remove the exhaust stack from the exhaust blower and store on the
chassis gooseneck for transport.
5
Remove the rubber seals from the joint and store for transport in the
control van. (Wipe clean prior to storage.)
6
Disconnect the expansion joint from the baghouse exhaust elbow. Leave
the expansion joint attached to the drum mixer duct.
7
Remove the duct elbow and store on the generator trailer for transport.
8
Remove the rubber seals from the joint and store for transport in the
control van. (Wipe clean prior to storage.)
9
Lower the handrail around the top of the baghouse into the transport
position.
10
Connect the hydraulic power pack and raise the trailer using the levelling
jacks so that the weight is removed from the screw jacks.
11
Remove the pads from the screw jacks and stow the pads and position
the legs in the transport position.
12
Lower the chassis onto the landing jacks in the transport position.
13
Fully retract the levelling jacks and disconnect the hydraulic power pack.
14
Raise the rear platform ladder into the transport position.
15
Connect the transport tractor and move the baghouse as desired.
page 2 - 62