TM 5-3895-374-10ItemProcedure11Install the red pipe cap onto the overflow/vent pipe on the hot oil heater.12Connect the transport tractor and move the asphalt tanker as desired.6.Baghouse Tear Down Procedures(See Figure 2-16)ItemProcedure1Remove any dust from the system by purging the system prior to shutdown.2Disconnect all control and power cables and store on brackets provided.3Disconnect the blower hose from the drum mixer and from the baghouse.Store in the basket on the drum meter.4Remove the exhaust stack from the exhaust blower and store on thechassis gooseneck for transport.5Remove the rubber seals from the joint and store for transport in thecontrol van. (Wipe clean prior to storage.)6Disconnect the expansion joint from the baghouse exhaust elbow. Leavethe expansion joint attached to the drum mixer duct.7Remove the duct elbow and store on the generator trailer for transport.8Remove the rubber seals from the joint and store for transport in thecontrol van. (Wipe clean prior to storage.)9Lower the handrail around the top of the baghouse into the transportposition.10Connect the hydraulic power pack and raise the trailer using the levellingjacks so that the weight is removed from the screw jacks.11Remove the pads from the screw jacks and stow the pads and positionthe legs in the transport position.12Lower the chassis onto the landing jacks in the transport position.13Fully retract the levelling jacks and disconnect the hydraulic power pack.14Raise the rear platform ladder into the transport position.15Connect the transport tractor and move the baghouse as desired.page 2 - 62
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business