TM 5-3895-374-10The standby generator is used during non operational periods. It provides power to the hot oil heater to maintain the liquidasphalt at operational temperatures. It also provides 110 volt power to the plant. This permits dedrumming operations tobe performed during the plant down period. This generator is also utilized during set up and tear down.-Standby Generator OperationNOTEComplete the control van and standby generator set up procedures before proceeding.See section 2-5.ItemProcedure1Start the 60 kW generator - follow procedures recommended onoperator’s instruction plate mounted on the generator. Perform PMCS asrequired in the generator manuals.2Motor control center #2 - turn main breaker OFF.3Motor control center #2 - turn alternate main breaker OFF.4Motor control center #2 - remove interlock key from main breaker andinstall key and unlock alternate main breaker.5Motor control center #2 - turn alternate main breaker ON.NOTEStandby power is now available:Switching from Standby Generator to Primary GeneratorsItemProcedure1Start the two 200 kW Primary Generators - follow proceduresrecommended on operator’s instruction plate mounted on the generators.Perform PMCS as required in the generator manuals.2Stop all equipment being powered through MCC #2.page 2 - 70
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business