TM 5-3895-374-10ItemProcedure6Raise the conveyor to maximum height with the hydraulic cylinder.7Using the hydraulic lifting jacks raise the trailer so that all weight isremoved from the screw jacks. Remove the pads and store the pads andthe legs.8Raise the front of the trailer using the levelling jacks.9Bolt the landing jacks into the transport position.10Retract all levelling jacks.11Disconnect the hydraulic power pack.12Connect the transport tractor to the trailer and pull the feed conveyorforward until the conveyor can be lowered without hitting the drum mixer.13Locate the hydraulic power pack and connect the hydraulic lines to theconveyor. Connect power cable and start the pump.14Lower the conveyor into transport position and secure.15Replace the fifth wheel adapter if the adapter is to be used.16Disconnect the hydraulic power pack.17Connect the transport tractor and move the feed conveyor as desired.4.Dedrummer/Melter Tear Down Procedures(See Figure 2-20)ItemProcedure1Remove all asphalt from drum meter tank. The asphalt should betransferred to a suitable transport vehicle.2Remove all diesel fuel from drum meter fuel tank. The fuel should betransferred to a suitable transport/storage vehicle.3Disconnect the power cables and store on brackets provided.4Close all hot oil valves on both ends of lines connecting the drum meterand the asphalt tanker.page 2 - 59
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business