TM 5-3895-374-10
Item
Procedure
17
Secure the top set first by retracting the lower cylinders. If the chassis is
not level the conveyor frame may not slide between these two tabs.
18
Push the conveyor frame sideways so that it will fit between the transport
lugs. If unable to accomplish this the chassis may need to be levelled.
Disconnect the hydraulic power pack from the conveyor control valve and
connect it to the levelling jack control valve. Level the rear of the chassis
so that the gathering conveyor will fit between the transport lugs. Re-
connect the hydraulic power pack back to the gathering conveyor control
valve.
19
After final position is obtained secure the conveyor into place with the four
transport bolts.
20
Connect the power pack to the hydraulic level jacks.
21
Use the hydraulic levelling jacks to relieve pressure from the screw jacks.
22
Remove the base pads from the screw jacks and install in the transport
position.
23
Position the screw jacks in the transport position.
24
Lower the trailer by retracting the levelling jacks.
25
Disconnect the hydraulic power pack.
26
Connect the transport tractor and move the four bin feeder as desired.
3.
Feed Conveyor Tear Down Procedures
(See Figure 2-22)
Item
Procedure
1
Ensure feed conveyor is empty of all aggregate.
2
Disconnect all control and power cables and store on brackets provided.
3
Secure the screen to the screen deck by using the red transport plates.
Bolt the four plates into the transport position.
4
Locate the hydraulic power pack and connect the hydraulic lines to the
conveyor control valve. Connect power cable and start the pump.
5
Disconnect the conveyor by removing the pins securing the conveyor to
the support structure.
page 2 - 58