TM 5-3895-374-10No.PanelValueOperation34BMotor control panel-press the BaghouseAirlockSTARTbutton (light will illuminate).35BMotor control panel-press the BaghouseDischargeInclineScrewSTART button (light will illuminate.36BMotor control panel-press the Baghouse TransferScrewSTART button (the light will illuminate).37BMotor control panel-press the BaghouseHopperScrewsSTART button (all four screws will start).NOTEA steady illuminated light will indicate that all four screws are running. A flashing light indicatesthat one or more did not start. (Panel B)38BMotor control panel-select AUTO on the BaghouseClean switch (light will illuminate when cleaning is inprogress during mixing process).39DBurner control panel-press START on FuelPump (lightwill illuminate).40D< 300 FBurner control panel-observe the stack temperature isbelow the high (alarm) set point StackControl.41DBurner control panel-if "limits" are closed PRESSLimitsSet(this button will light).NOTEThe purge process has been activated and the air in the drum and baghouse is being exhausted.42DBurner control panel-upon completion of the purge, thepurge complete light will illuminate.43DBurner control panel-DEPRESS the Pilotbutton andhold until the pilot is on (approximately 5 to 10 seconds-the pilot on light will illuminate).Page 2-104
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business