TM 5-3895-374-10
No.
Panel
Value
Operation
34
B
Motor control panel-press the Baghouse Airlock START
button (light will illuminate).
35
B
Motor control panel-press the Baghouse Discharge
Incline Screw START button (light will illuminate.
36
B
Motor control panel-press the Baghouse Transfer Screw
START button (the light will illuminate).
37
B
Motor control panel-press the Baghouse Hopper Screws
START button (all four screws will start).
NOTE
A steady illuminated light will indicate that all four screws are running. A flashing light indicates
that one or more did not start. (Panel B)
38
B
Motor control panel-select AUTO on the Baghouse
Clean switch (light will illuminate when cleaning is in
progress during mixing process).
39
D
Burner control panel-press START on Fuel Pump (light
will illuminate).
40
D
< 300 F
Burner control panel-observe the stack temperature is
below the high (alarm) set point Stack Control.
41
D
Burner control panel-if "limits" are closed PRESS
Limits Set (this button will light).
NOTE
The purge process has been activated and the air in the drum and baghouse is being exhausted.
42
D
Burner control panel-upon completion of the purge, the
purge complete light will illuminate.
43
D
Burner control panel-DEPRESS the Pilot button and
hold until the pilot is on (approximately 5 to 10 seconds-
the pilot on light will illuminate).
Page 2-104
