TM 5-3895-374-10
1.Electrical Power Cables and Control Cables
(See Figures 2-31 and 2-32)
Item
Procedure
1
Determine if any components of the amp must be run prior to tear down
of the plant.If not, proceed as follows:
2
The electrical control cables can be unplugged from the control van and
wrapped onto their individual transport support brackets.Complete this in
the following order:
Four Bin Feeder
Feed Conveyor
Drum Mixer
Asphalt Tanker
Baghouse
3
The electrical power cables can be unplugged from the control van and
wrapped onto their individual transport support brackets.Complete this in
the following order:
Four Bin Feeder
Feed Conveyor
Drum Mixer
Asphalt Tanker
Dedrummer/Melter
Baghouse
2.FourBin Feeder Tear Down Procedures
(See Figures 2-24, 2-25, 2-26, 2-27 and 2-28)
The ramp must be removed prior to the tear down of the Four Bin Feeder
Item
Procedure
1
All four hoppers must be empty.Remove all aggregate from the bins and
belts.Select bypass on the drum interlock selector switch on the motor
control panel.Position the drum bypass chute deflector plate so that
aggregate bypasses the drum.Run the conveyors to empty the bins and
belts.The aggregate will discharge out the calibration chute. Use the
loader or a truck to collect the aggregate
page 2 - 56