TM 5-3895-374-10No.PanelValueOperation9DBurner control panel-press STOP on FuelPump button (light will extinguish).10BMotor control panel-press STOP on ExhaustFan button (light will extinguish).NOTEThe baghouse fines blower, airlock, discharge incline screw, transfer screw and hopper screws will stop and pilotlight will extinguish.NOTEBaghouse bag cleaning will cycle for a 5 minute period prior to shutting off.11BMotor control panel-press STOP button on Hot Mix Conveyor (conveyor will stopafter a 30 second delay). This will cause the drum, feed conveyor, scalping screen,and gathering conveyor to stop and pilot lights to extinguish.12BMotor control panel-select OPEN on the Batcher switch.13BMotor control panel-select OFF on the SurqeBinHeat switch.14BMotor control panel-select OPEN on the DischargeGate switch when the bin isempty.15BMotor control panel-select OPEN on the Batcher switch.NOTEProceed with the following steps only after the surge bin has been emptied. For operation of the surge bin seesection 2-19.16BMotor control panel-select OFF on the SurqeBinAir switch.17BMotor control panel-select OFF on the Baqhouse Air switch.18AFeeder panel-select AsphaltMeterinqPump REVERSE then MANUAL (motorshould run at 50% speed on the meter. Adjust on ManualSpeed if necessary )page 2-116
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business