TM 5-3895-374-10
No.
Panel
Value
Operation
19
A
Feeder panel-select Divert valve to DRUM.
NOTE
Monitor asphalt flow rate on process screen. When rate returns to zero proceed as follows:
20
A
Feeder panel-select Divert switch to DIVERT.
21
A
Feeder panel-select OFF on the Asphalt Meterinq Pump switch.
22
A
Feeder panel-turn Power key switch to OFF.
23
Motor control room-select OFF on the two Main Breakers (one on each panel).
NOTE
Shut down the two 200 kW generators (not necessary if operating on
commercial power).
Upon completing a plant shut down perform a "after" Operation PMCS.
2-19 Surge Bin Operation
(Power switch must be in "ON" position)
No.
Panel
Operation
1
B
Motor control panel-turn Surqe Bin Air to ON.
2
B
Motor control panel-turn Surge Bin Heat to ON.
3
B
Motor control panel-turn Batcher to AUTO when mixing.
4
B
Motor control panel-turn Discharge Gate to CLOSE when mixing.
5
B
Motor control panel-Surqe Bin Low Level light indicates a minimum volume of
mix in bin.
6
B
Motor control panel-Surqe Bin High Level light indicates a maximum volume of
mix in bin.
page 2-117