TM 5-3895-374-10No.PanelValueOperation5ScreenScreen-monitor asphalt tons per hour to see that adecrease does occur and that the mix is within tolerance(if it is not within tolerance an alarm should sound).6ScreenRepeat monitoring process at 5 minute intervals untildesired production rate has been reached.2-16 Hot Shut DownThe hot shut down procedure allows the operator to cease plant production without discharging the materiels beingprocessed through the plant. A shut down of this nature should only be performed if the plant will be restarting (hot start,see section 217) within a short (fifteen minute) period. Implement this procedure when the surge bin is full and trucks willbe loading hot mix shortly or if a minor adjustment or correction must be made that will require only a few minutes.A hot shut down procedure should not be performed if the plant will not be producing within fifteen minutes.If it is not possible to continue production within a short period of time, perform a normal shut down, see section 2-18.NOTEFailure to perform this procedure within the time stated may result in damage to theequipment and cause the asphalt mix in the drum to become hard and plug the drummixer.No.PanelValueOperation1DBurner control panel-select MainFlameswitch and turnto OFF.2DBurner control panel-silence burner alarm by PRESSINGAlarmSilenceswitch.page 2-111
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business