TM 5-3895-368-14&PSection V. - PREPARATION FOR SHIPMENT OR STORAGE5-1.Preparation for Shipment.NOTEA suitable lifting device, of sufficientcapacity, (approximately 12, 100 lbs.)must be available for disassembly,packing and loading of the asphaltmelter on carrier.a.Remove the drum sling (3, figure 2-12), andhoist (2) from melter.b.Remove the trolley (1) as follows:(1)Remove one cotter pin (figure 2-13), clevispin and adjusting collar.(2)Remove the side #1 from load bar andremove the rest of trolley from trolleybeam.c.Remove the discharge chute as follows:(1)Refer to figure 2-10, and fold the barrelretainer onto the chute floor.(2)Pivot both legs with leg extensions up andcatch in the open bracket to secure formoving.(3)Attach a suitable hoist and lift thedischarge chute from the rear of themelter and set aside in the work area soas not to obstruct access to the rest of themelter.d.Remove the hand winches as follows:(1)Remove the wire rope clip (figure 2-11), torelease the wire rope from the door liftring.(2)Crank the winch to reeve the wire ropeonto the winch reel. Tape the wire rope toprevent roe from unreeving.(3)Remove three nuts, lockwashers, flatwashers and capscrews and remove handwinch from brake.(4)Repeat steps 1 through 3 to remove reardoor winch.e.Remove guard rails as follows (figure 2-9):(1)Remove capscrews (6), lockwashers (4)and nuts (5) that secure left side rail (7),front corner rail (8), front rail support (9),right side railing (11), and latter railing(13).(2)Remove capscrews (14), lockwashers (4),and nuts (5) that secure rail supports (10and 12) to the platform.(3)Remove nuts (2) and lockwashers (1) thatsecure the rear rail corners (3) to thetunnel.f.Remove load platform upper structure as follows(figure 2-8):(1)Remove capscrews (7), nuts (2) andlockwashers (3) that secure trolley beam(5). Remove beam (5) from structure.(2)Remove capscrews (10), nuts (8), andlockwashers (9) that secure cross beams(1 and 4). Remove the cross beams (1and 4).(3)Carefully supporting each up-right support(6), remove the capscrews (7), nuts (2)and lockwashers (3) that secure thesupports to the platform. Remove eachsupport from platform.g.Remove the platform as follows (figure 2-7):(1)Remove capscrews (3), nuts (4) andlockwashers (5) that secure ramp brackets(2) and load ramp (1) to the platform (13).Remove the load ramp (1).(2)Remove capscrews (8 and 9), nuts (4),and lockwashers (5) that secure the ladderbrace (10) and ladder (7) to platform (13)and leg (6). Remove the ladder (7).(3)Remove capscrews (8 and 3), nuts (4),and lockwashers (5) that secure platformbraces (12) to legs (8) and bracket onstorage tank. Remove braces (12).(4)Attach a suitable hoist to support the platform (13). Remove capscrews (8), nuts(4), and lockwashers (5) that secure thelegs (6) to the platform (13). Remove thelegs (6) and extensions (11).(5)Remove capscrews (9), nuts (4), andlockwashers (5) that secure the platform(13) to the brackets on storage tankstandoff tube. With hoist lift the platform(13) from the melter and set aside.5-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business