TM 5-3895-368-14&P(4)Install brake armature (5) and two springs(6). Compress the springs and installassembled field (8), securing with nuts(10). Tighten nuts to seat field (8) with a0.020-0.030 inch gap to armature (5).(5)If removed, install contactor (36) tobracket (38), securing with screws (35).(6)Install assembled bracket and contactor toframe assembly with screw (41), at uppermounting hole of bracket.(7)Secure control cable and ground lead ofpower cable (23) to boss in frameassembly with flat washer (18),lockwasher (17), and screw (16).(8)Refer to noted tags on control and powercables (22 and 23) and wiring diagram(Figure 4-8) and connect all electricalleads. Carefully coil all long leads withoutsharp bends and tape to ensure leads willnot touch brake discs.(9)Carefully install cover (11, Figure 4-3)without pinching wore leads, securing withtwo screws (13) and lockwashers (14).l.Assembly - Lower Hook Assembly and LooseEnd Chain (Figure 4-4)(1)If removed, install latch (48) and latchspring (50), applying torque to the springto keep the latch closed. Secure latch andspring with screw (49) and nut (51).(2)Assemble lower hook (47), body (46),washer (45), and thrust bearing (44).Secure with castle nut (43), tightening nutfirmly and then back off nut to align slot innut with hole through stem of hook (47)and install pin (52).(4)Position the lower hook body (46) in a vicewith the larger pin hole facing up. Slidelast link of load chain in slot of block (54)and position block into lower hook body,ensuring that bore is with the pin hole inhook body. Install pin (53), small end first,and seat pin with hammer until flush withsurface of hook body.(5)Install loose end chain (15) to loose endblock (16) and secure with pin (17).(6)Install stop block (19) onto end of loadchain (55) and insert last link into the looseend block (16). Secure the load chain withpin (18).(7)Secure end of loose end chain (15) tomotor housing (56) with capscrew (14),lockwasher (13), and flat washer (12).m.Installation.(1)Install the electric hoist (2, Figure 2-12) tothe melter by hooking the uppersuspension hook to the trolley.(2)Install the drum sling (3) in the lower hookassembly as shown in figure 2-12.(3)Connect the power cord to an approved110 volt power supply furnished for themelters.4-15 (4-16 Blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business