TM 5-3895-374-24-2
7. Electrical power supply
7-1 Installation of power supply cable (PT and GT type)
(1) Provide a messenger wire (3-6mm dia. wire) along the beam and
hang the power supply cable without twisting it through the
cable hangers.
(2) Install the messenger wire as shown in Fig. 7. For PT and
GT types, the wire should be located on the right side of the
cable hanger arm of the hoist.
Fig. 7
When the beam has a curve, messenger wire at the curve can not
be installed. A special T type cable hanger for the curved
beam section is available upon request. Consult your local
dealer for proper number of hangers and spacing between them as
they differ depending on the location and radius of the curve
in the beam.
Also consult your local dealer in case the electrical power
supply is by means of other ways.
7-2 Electrical wiring
Kito single phase hoist can be used on single phase electric power
source. Compared with conventional home electrical equipment, a
big capacity's motor is used on the hoist. Consult your local
electrical workers for proper wiring of the single phase hoist.
(page 3 - 886)