Home
Download PDF
Order CD-ROM
Order in Print
Figure 2-4. Asphalt Melter Basic Piping and Valve Installation
Figure 2-6. Hot Oil and Asphalt Piping for Multiple Unit Installation.
TM-5-3895-368-14P Hammer Pile Driver Self-Powered Diesel Manual
Page Navigation
6
7
8
9
10
11
12
13
14
15
16
TM 5-3895-368-14&P
1. Connector (2)
2. Coupling
3. Hose
4. Tee
5. Plug
6. Plug (2)
7. Pipe Assembly (2)
8. Gasket (4)
9. Cover (2)
10. Capscrew, 5/8NC x
2 ½ (16)
11. Nut, 5/8NC (16)
Figure 2-5. Hot Oil and Asphalt Piping for Single Unit Installation.
2-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business