Home
Download PDF
Order CD-ROM
Order in Print
Figure 2-3. Tunnel and Associated Parts
Figure 2-5. Hot Oil and Asphalt Piping for Single Unit Installation.
TM-5-3895-368-14P Hammer Pile Driver Self-Powered Diesel Manual
Page Navigation
5
6
7
8
9
10
11
12
13
14
15
TM 5-3895-368-14&P
1. Union (2)
2. Pipe Assembly
3. Capscrew, 5/8NC x 2
(20)
4. Gasket (7)
5. Nut, 5/8NC (20)
6. Pipe Assembly
7. Valve (3)
8. Gasket (2)
9. Nut (8)
10. Pipe Assembly
11. Hose Assembly (2)
12. Nipple
13. Connector
14. Cover
15. Wrench
16. Valve
17. Pipe Assembly
18. Capscrew (8)
19. Pipe Assembly
20. Capscrew, 5/8NC x
2 ½ (8)
21. Nut, 5/8NC (8)
22. Pipe Assembly
Figure 2-4. Asphalt Melter Basic Piping and Valve Installation.
2-8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business