• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Physical Installation
WIRING OF LOAD CELLS

TM-5-3895-374-24-1 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
TM 5-3895-374-24-1 GP470FA WIRING OF POWER  - Slimline Models Connect 12 VDC Power to terminal board at back of indicator - see fig 2 Fig.  2 12 VDC Power Connection - Slimline Wiring of Load Coils 1a) Desk-too Models - Models with Self-Contained Power.  Supply. Remove the top cover of the indicator (4 screws at side) Load Cell cables are routed through rubber grommets in the back cover Connect leads to the two level connector block, TB1 (see Fig.  3). FIG.  3 - TB1 LOAD CELL CONNECOR BLOCK - DESKTOP The upper level is for load cell excitation.  The upper level terminals are as follows The lower level terminals are as follows: (page 3-58)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.