• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section Preparation for Splicing - TM-5-3895-374-24-1_150
Joining Sections - TM-5-3895-374-24-1_152

TM-5-3895-374-24-1 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  106    107    108    109    110  111  112    113    114    115    116  
TM 5-3895-374-24-1 I-4    If  optional  horizontal  bus  barriers  are  provided,  they must be removed from the left side of the Section R. In  Section  L  remove  the  horizontal  bus  barrier  from the right side of that section. J-5  Remove  the  front  half  of  the  vertical  bus  barrier  in Section L. a.     Remove  retaining  screws  from  the  vertical  bus barrier. b Remove  front  barrier  from  the   vertical   bus   by lifting and pulling forward. I-6      Remove   the   bottom   unit   and   its   support   pan   to expose base channel mounting holes. The following procedure is used to remove the unit support pan”: a Remove  grommets  and  wire  guards  from  wire port between unit and the vertical wire trough. b With the unit door open, lift right side of pan and move  forward  until  rub  on  left  side  clears  the note  on  vertical  mounting  bracket  Tilt  left  side down and remove pan from section. Remove  front  bottom  horizontal  wire  trough  cover present, to expose base channel mounting hole. (Page 3-123)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.