TM 5-3895-374-24-2Installation6. Install trough covers in proper sequence. Properly locate inlet openings. Handle covers with reasonable care toavoid warping or bending. Attach covers securely to trough. Do not overtighten as cover damage may result.7. Rotate conveyor by hand to insure no binding occurs.8. Install drive at proper location and in accordance with separate instructions or drawing provided. Install all guards.9. Check screw rotation for proper direction of material travel after electrical connections have been made, but beforeattempting to handle material. Incorrect screw rotation can result in serious damage to the conveyor and torelated conveying and drive equipment. If necessary, reconnect electrical leads to reverse rotation of conveyorand direction of material flow.10. Attach all gates, feed chute, discharge chute, etc. and connect all safety devices and controls. CAREFULLYTEST TO INSURE PROPER OPERATION.page 3 - 749
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business