TM 5-3895-374-107. Baghouse:The baghouse is positioned in line with the drum mixer. An expansion joint in the ducting between thetwo components allows for slight misalignment.8.Asphalt Tanker:The asphalt tanker is positioned next and connects to the drum mixer.9.Dedrummer/Melter:The dedrummer/asphalt melter is positioned relative to the asphalt tanker.10. Feed Conveyor:The feed conveyor is positioned so that the discharge chute is centered on the drum mixer inletchute.11. Four Bin Feeder:The four bin feeder is positioned so that the gathering conveyor discharges onto the upperportion of the screen on the feed conveyor.2-5. Plant Set UpThe plant equipment must be set up in the following sequence.1.Control Van2.Standby Generator3.Generator Trailer4.Hydraulic Power Pack5.Surge Bin6.Drum Mixer7.Baghouse8.Asphalt Tanker9.Dedrummer/Melter10.Feed Conveyor11.Four Bin FeederThe AMP has been provided with three types of legs which are used to set up and support the plant.Landing Jacks: One pair per trailer mounted at the gooseneck. Trailer landing legs or jacks. These are crank style andused for support prior to and after transport.Hydraulic Levelling Jacks: One or more pair of hydraulic cylinders mounted on the trailer chassis. These are used to raiseand lower the trailer so that the screw jacks may be positioned in the operating position or in the transport position (Notsupplied on all trailers.)page 2-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business