TM 5-3895-374-10ItemProcedure19Keyboard-press ESCAPE, formulas (2), edit (00) ENTER.20Keyboard-enter the following calibration formula:-Go to Mix 10--Total A/C 0.0% A/C-1 Vir 50.0% Agg-2 Vir 50.0% Agg21Press ESC.22Feeder bins one and two will be the ones used to calibrate the scale. The percent moisture inthe materiel being used to calibrate should be zero. Verify this on the screen.23Obtain a stable belt scale zero as follows:-The monitor should be displaying the main screen-Keyboard-press ESCAPE to display the options window.-Utilities (8)-Calibration-Meters-Rates by a average value (2), the average tons per hour will be calculated. Allow this tocontinue for 180 seconds.-Correct average readings (9), "actual values" will be displayed. The non zero value will bedisplayed. Correct this by entering zeros into the "actual values".-Repeat this procedure as required until the zero has stabilized and reads less than "0.10" tonsper hour.-This completes the zero correction.-Press ESCAPE returning to the calibration screen.-Press aggregate scales by sample (4).24Keyboard-Press parameters (4)-Enter the mix number that will be used for test purposes.-Enter 100 tph-Enter 60 seconds for each 2 tons that can be loaded into the truck-Press ESCAPE-Press clear (00)-The tons totalizer is now set to 0.25Feeder panel-press START on the ScalpingScreen button.26Feeder panel-press START on the GatheringConveyor.27Feeder panel-select AUTO on the four Feeder switches.page 2-88
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business