• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Electrical Power Cables and Control Cables - TM-5-3895-374-10_93
Asphalt Tanker Tear Down Procedures

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
TM 5-3895-374-10 Item Procedure 5 Disconnect the hot oil transfer lines.  Use a five gallon pail to collect liquid in the lines. CAUTION Ensure there is no pressure on the line and that protective clothing is worn.  Cover the joints with a protective cover (heavy canvas blanket or similar materiel) as the joint is opened.  The blanket will deflect any oil pressure and protect the operator.  This operation Is best done after the system has cooled. 6 Disconnect the asphalt feed line.  Use a five gallon pail to collect liquid in the line. CAUTION Ensure there is no pressure on the line and that protective clothing Is worn.  Cover the joints with a protective cover (heavy canvas blanket or similar materiel) as the joint is opened.  The blanket will deflect any liquid asphalt pressure and protect the operator.  This operation is best done after the system has cooled. 7 Disconnect the fuel line from the fuel tank to the asphalt tanker hot oil heater. 8 Disconnect the fuel line from the fuel tank to the drum mixer burner. 9 Remove the chain hoist from the jib trolley and secure in storage box. 10 Use a fork lift and lower the jib into transport position.  Remove the pin located in the support post and reinstall in the lowered transport position. 11 Connect the hydraulic power pack and raise the trailer using the levelling jacks so that the weight is removed from the screw jacks. 12 Remove the pads from the screw jacks and stow the pads and legs in the transport position.  Install the strap on the rear screw jack pads that prevent them from turning. 13 Lower the chassis onto the landing jacks in the transport position. 14 Fully retract the levelling jacks and disconnect the hydraulic power pack. 15 Stow hot oil transfer lines, asphalt lines, fuel lines and air lines in the basket provided on the side of the chassis. 16 Connect the transport tractor and move the drum melter as desired. page 2 - 60







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.