• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Plant Tear Down
Electrical Power Cables and Control Cables - TM-5-3895-374-10_91

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  75    76    77    78    79  80  81    82    83    84    85  
TM 5-3895-374-10 1.Electrical Power Cables and Control Cables (See Figures 2-31 and 2-32) Item Procedure 1 Determine if any components of the amp must be run prior to tear down of the plant.If not, proceed as follows: 2 The electrical control cables can be unplugged from the control van and wrapped onto their individual transport support brackets.Complete this in the following order: Four Bin Feeder Feed Conveyor Drum Mixer Asphalt Tanker Baghouse 3 The electrical power cables can be unplugged from the control van and wrapped onto their individual transport support brackets.Complete this in the following order: Four Bin Feeder Feed Conveyor Drum Mixer Asphalt Tanker Dedrummer/Melter Baghouse 2.FourBin Feeder Tear Down Procedures (See Figures 2-24, 2-25, 2-26, 2-27 and 2-28) The ramp must be removed prior to the tear down of the Four Bin Feeder Item Procedure 1 All four hoppers must be empty.Remove all aggregate from the bins and belts.Select bypass on the drum interlock selector switch on the motor control panel.Position the drum bypass chute deflector plate so that aggregate bypasses the drum.Run the conveyors to empty the bins and belts.The aggregate will discharge out the calibration chute.  Use the loader or a truck to collect the aggregate page 2 - 56







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.