110 Volt power should be available in the control house
These units should run for a minimum of 15 minutes to warm up both conveyors

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  121    122    123    124    125  126  127    128    129    130    131  
TM 5-3895-374-10 No. Panel Value Operation NOTE The outlet temperature is controlled by the hot oil heater 16 C Corner panel-the  outlet  temperature  should  be   greater than the inlet temperature if heater is operating. NOTE As the asphalt temperature reaches the desired temperature the inlet and outlet temperatures will be within a degree or two of each other.  The heater will automatically cut-off.  (Comer Panel) 17 A Feeder panel-select DIVERT on the Divert Switch. 18 A Feeder     panel-select     FORWARD     on     the Asphalt Meterinq Pump. 19 A Feeder    panel-select    MANUAL    on    the    manual    auto selector switch Asphalt Meterinq Pump. 20 A Feeder   panel-adjust   speed   on   the   dial   indicator   to approximately 50% Manual Speed. 21 Screen Verify    pump    is    pumping    asphalt    by    checking    the monitor. 22 Screen This  will  appear  in  the  second  information  line  from  the top (it reads asphalt). 23 Screen 260 to The temperature of the asphalt will be displayed in the 300F last column. 24 Circulate asphalt for a minimum of 10 minutes to warm up pump and valves. 25 Visual Verify that the batcher gate is open. Check NOTE The main gate should be closed (visual check). 26 B Motor control panel-turn Surqe Bin Air compressor and Baqhouse Air compressor to the ON position. Page 2-102







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.