• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
The purge process has been activated and the air in the drum and baghouse is being exhausted. - TM-5-3895-374-10_139
Hold plant production rate at this tonnage for 15 to 30 minutes

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  125    126    127    128    129  130  131    132    133    134    135  
TM 5-3895-374-10 No. Panel Value Operation 55 A Feeder  panel-select  AUTO  on  the  Divert  switch  (verify that the Divert light continues to be illuminated). 56 A Feeder panel-select AUTO on the four Feeder switches. 57 A Feeder    panel-press    START    on    the    Scalping    Screen button (the light will illuminate). 58 A Feeder  panel-press  START  on  the  Gathering  Conveyor button (the light will illuminate). 59 Keyboard Keyboard-press     ESCAPE,     select     targets     (1),     enter starting feed rate-80 tons per hour, press ENTER. 60 Screen Select desired mix formula (this must be pre-determined and entered into the controller), ENTER. 61 A, B, D Check  all  control  panels  to  verify  all  motors  are  running (no flashing lights). 62 Keyboard Keyboard-press     ESCAPE     the     feeders     will     start     in sequence. 63 A Feeder     panel-verify     that     the     selected     feeders     are running. 64 A Feeder panel-check the feeder selector switch lights. 65 D Burner control panel-when materiel begins to enter drum, slowly  increase  burner  firing  rate  by  depressing  the  UP ARROW on the Stack Control. 66 D 300 F Burner  control   panel-increase   until   stack   control   reads approximately 300°. 67 D Burner   control   panel-maintain   at   this   temperature   by increasing (UP ARROW) or decreasing (DOWN ARROW) the burner firing rate on the Stack Control. page 2-106







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.