• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
The main gate should be closed (visual check)
The purge process has been activated and the air in the drum and baghouse is being exhausted. - TM-5-3895-374-10_138

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  122    123    124    125    126  127  128    129    130    131    132  
TM 5-3895-374-10 No. Panel Value Operation NOTE Switch will illuminate and  when  the  compressor  reaches  the  high  pressure  set  point,    the  motor will stop and the light will go out.  This will light only when the compressor is running.  When air pressure  is  up  and  the  compressor  shuts  off  the  light  will  go  out.    This  confirms  that  the  air pressure switch is working.  (Panel B) 27 B Motor  control  panel-depress  the  START  button  on  the Hot Mix Convevor (the light will illuminate    after    a    short delay). 28 B Motor  control  panel-check  hot  mix  conveyor  load  meter to verify loading of the conveyor motor. NOTE This motor will draw high amps until the slat is warmed up. 29 B Motor control panel-depress START on the Drum Drive (the light will illuminate after a short delay). 30 A Feeder  panel-depress  the  START  button  on  the  Feed Conveyor (light will illuminate immediately). NOTE These units should run for a minimum of 15 minutes to warm up both conveyors. 31 B Motor  control  panel-turn  the  Surqe  Bin  Heat  selector switch to ON (the light will illuminate). 32 B Motor  control  panel-press  the  START  button  on  the Exhaust Fan (the light will illuminate after short delay). NOTE Observe the ammeter to verify the amperage draw (light will illuminate after a short delay).  (Panel B) 33 B Motor  control  panel-press  the  Baqhouse  Fines  Blower START button (light will illuminate). Page 2-103







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.