TM 5-3895-374-24-2Table 13. Mounting of trolley on beam1) Adjustment of trolley width before mounting.Make adjustments as follows for a proper clearance, with the trolley connected to the electric ormanual chain hoist.Adjustment of A dimensionProper A dimension is beam width (B) + about 4mm.Make adjustment by adding or taking out the outer spacers, without caring about the number ofspacers shown in Table 1.Adjustment of C dimensionProper C dimension is about 7-13 mm for ½ton to 3ton and 9-15 mm for 5 ton capacity. Makeadjustments by adding or taking out the inner spacers on side plate SN side, without caring aboutthe number of spacers shown in Table 1. There is a difference of spacer between the right and leftside. However, this does not pose any problem. Minimum one piece of spacer is required on bothsides.After adjustment, securely insert the splitpin into the shaft stopper pin and bendsecurely both branches of the split pin.Fig. 2(page 3 - 876)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business