Stake the Baghouse left hand front and rear corners according to Figure 2-1. Site along the Drum Mixer to keep the units in
line. Use surveyors tape or colored rope between the two stakes. Back the Baghouse into position.
Item
Procedure
1
Remove the duct elbow section from the 200 kW generator trailer and install it onto the baghouse
shutter door housing. Check the seal, install and tighten all the bolts.
2
Position the baghouse according to the site layout. Locate in line with drum mixer backing up unit
until the drum duct and baghouse ductflanges meet. Install the bolts.
3
Disconnect the baghouse from the transport tractor.
4
Connect the hydraulic power pack.
5
Use the hydraulic leveling jacks to raise the baghouse.
6
Lower the four screw jacks and install pads.
7
Extend the screw jacks.
8
Retract the leveling jacks until the baghouse is supported on the screw jacks.
9
Check the chassis to see that it is level side to side and front to back.
10
If adjustment is required use the leveling jacks to raise the chassis and adjust the screw jacks as
required.
11
Retract the leveling jacks.
12
Disconnect the hydraulic power pack.
13
Remove the stack from the transport position and install it onto the exhaust outlet. Check the seal
and then connect with bolts.
14 Position the handrail and ladders into the operating position