TM 5-3895-374-10
Item
Procedure
14
If the trailer is not level raise the trailer with the hydraulic leveling jacks and adjust the screw
jacks. Continue until the trailer is level side to side and at the proper angle end to end (level
will indicate level if properly positioned on leveling pads).
15 Retract the hydraulic leveling jacks.
16 Disconnect the hydraulic power pack.
17
Remove the exhaust ducting support leg from the goose neck area of the trailer. Fold the upper
exhaust plenum into position using a crane. Make sure that the seal on the flange is not
damaged and is free from debris which would prevent it from sealing.
18 Install the bolts in the plenum flange and tighten them.
19 Install the ducting support leg onto the front of the trailer.
20
Remove the two sections of the ducting which are mounted on the front of the 200 kW generator
trailer. Position them on the ground with the two flanges matched according to the markings.
21 Install the bolts checking to insure the seal is in tact and free from debris
which may prevent a good seal.
22 Install the expansion joint onto the duct.
23
Use a crane to lift the assembled section of ducting into place on the front of the drum. The
assembly rest on the support leg above the goose-neck and mates with the drum exhaust
plenum. The expansion joint is positioned away from the drum and will attach to the bag house.
Bolt the duct to the exhaust plenum.
24 Install the bolts and tighten.
25 Remove the bypass chute from transport position and install onto the feed chute.