• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
"BLACK LIGHT TEST" - LEAK DETECTION
NORMAL BAGHOUSE OPERATION

TM-5-3895-374-24-2 M081 Asphalt Mixing Plant Manual
Page Navigation
  27    28    29    30    31  32  33    34    35    36    37  
TM 5-3895-374-24-2 FEBRUARY 1993 HIGH TEMPERATURE -BAGHOUSE START-UP The  following  instructions  should  be  carefully  followed  to  avoid  problems  which  could  occur  during  start-up. Improper start-up could cause: - motor overload - burner blow out - damage to filter fabric 1. Damper down 90% 2. Start burners - preheat system quickly to reduce condensation. 3. Bump start fan 3 or 4 times to draw warm air in to semi-heat baghouse. 4. Start blower. 5. Slowly open damper while monitoring motor current to design current load.  Do not exceed full load current. 6. When operating temperature is reached throughout system, begin product flow. 7. After reaching a pressure drop of 6 inches across baghouse, begin cleaning cycle. 8. As system stabilizes, readjust dampers as required. All high temperature installations should be installed with a high temperature cut-out switch in the duct prior to the baghouse.  To protect bags from burning, adjust the switch to shut fan off between 375 and 400 degrees F. CAUTION: If burners should accidentally be blown out, ventilate baghouse before restarting. page 3 - 692







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.