TM 5-3895-374-24-2 2. Install the electric motor to the mount and loosely install the fasteners. 3. Install  the  sheaves  according  to  the  instructions  in  Section  3-5-14.    Check  the  alignment  by  placing  a straight edge across the two sheaves.  The straight edge should contact the both sheaves in two places.  If it does not adjust the drive so that it is aligned. 4. Install the drive belt and adjust the tension on the belt so that it does not deflect more than 1/4". 5. Tighten the fasteners holding the electric motor. 6. The ground strap must be reinstalled to the motor. 7. Connect the wiring in the junction box following the markings made at disassembly. 8. Install the drive guard. 9. Inspect all components that have been re-installed.  Confirm that all fasteners have been torqued. 10. Remove padlock from the main breaker and turn it on. page 3 - 852







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.