TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  132    133    134    135    136  137  138    139    140    141    142  
TM 5-3895-374-10 No. Panel Value Operation NOTE The purge process has been activated and the air in the drum and baghouse is being exhausted. 6 D Burner  control  panel-upon  completion  of  the  purge,  the Purqe Complete light will illuminate. 7 D Burner  control  panel-DEPRESS  the  Pilot  On  button  and hold until the pilot lights--approximately 5  to  10  seconds (pilot on light will illuminate). NOTE Burner panel-confirm on flame meter a signal of 1.5 to 2 micro amps (Panel D) No. Panel Value Operation 8 D Burner control panel-select Control Mode to STACK. 9 D Burner   control   panel-select   Main   Flame   START   and release (this is a momentary contact switch). 10 D Burner control panel-main fire will ignite in approximately 15 seconds (Main Flame Proved light will illuminate). 11 D Burner    control    panel-monitor    stack    temperature    on Stack  Control  (this  will  indicate  the  temperature  of  the exhaust air exiting the drum mixer). 12 D Burner   control   panel-manually   increase   burner   firing rate  on  the  burner  by  depressing  the  UP  ARROW  on Stack  Control.    Slowly  (20  to  30  seconds)  continue  to increase the burner firing rate and the temperature until the stack control reaches 2500. page 2-113







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.