Switching from Standby Generator to Primary Generators
Operator Controls

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  90    91    92    93    94  95  96    97    98    99    100  
TM 5-3895-374-10 Item Procedure 3 Motor Control Center #2 - turn alternate main breaker OFF. 4 Motor Control Center #2 - remove interlock key from breaker unit and install key and unlock main breaker. 5 Motor Control Center #2 - remove interlock key from breaker unit and install key and unlock main breaker. 6 Motor Control Center #1 - turn main breaker ON. NOTE Power is now available to the complete plant Switching from Primary Generators to Standby Generator Item Procedure 1 Start the 60 kW Generator - follow procedures recommended on operator’s instruction plate mounted on the generator.  Perform PMCS as required in the generator manuals. 2 Stop all equipment being powered through MCC #2. 3 Motor Control Center #2 - turn main breaker OFF. 4 Motor Control Center #2 - Remove interlock key from main breaker and install key and unlock main breaker for standby generator. 5 Motor Control Center #2 - turn alternate main breaker ON. NOTE Power is now available. Utility (Line) Power The plant may be operated on utility power.  This requires main service of 600 amps480 volt three phase.  Two sub feeders from the main service rated at 300 amps full load can be connected to the two motor control centers. page 2 - 71







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.