TM 5-3895-374-10 Sectionalization is accomplished during the tear down of the asphalt mixing plant. Tear down is complete when the plant is ready for transport.  No further sectionalization is required. 3.Special Materials Handling Equipment (MHE) The following equipment will be required for marine transportation: 1.Slings 2.Tie down cables or chains 3.Spreader bars (one set provided with the AMP) 4.Blocking for kingpins 5.Wheel chocks 4.Speed Requirements The maximum towed speed for all components is as follows: 1.Paved roadway - 40 miles per hour over smooth hard surfaced primary highways. 2.Unpaved roadway - 10 miles per hour. 5.Over Dimensional Trailers The M081 Asphalt Mixing Plant includes trailers which may exceed the allowable length or width.  Prior to movement obtain any necessary permits or approvals required to move the trailer. Ground clearance in some trailers may be restricted.  Inspect prior to movement and transport those trailers with additional care. II. PREPARING TO PRODUCE 2-8. Electrical Power Supply The M081 Asphalt Mixing Plant is powered by two primary 200 kW generators and one standby 60 kW generator.  During mixing operations power is required from both primary generators. page 2 - 69







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.