7.
Using the face spanner wrench tighten the cylinder head into the cylinder tube until the outer face of the cylinder
head is flush with the end of the cylinder tube.
8.
Install the hydraulic cylinder onto the equipment and connect the hoses.
9.
Upon installation of the cylinder, completely extend and retract the cylinder under no load several times to allow
trapped air to escape through to the reservoir.
3-9
Four Bin Feeder
3-9-1
Belt Feeder Drives
Removal, Repair and Replacement. See figure 3-58.
This procedure assumes a complete removal, repair and replacement of the assembly. A partial disassembly, repair and
replacement is possible. Follow the procedure to the point of removing only those components requiring repair or
replacement. The procedure is the same for all four of the feeder drives.
A.
Disassembly
1.
Disconnect and lock out the breaker for the feeder drive motor and the gathering conveyor motor.
2.
Remove the fasteners holding the outer half of the drive guard and remove the drive guard.
3.
Remove the motor and gear reducer sheaves following the instructions in Section 3-9-12.
4.
Remove the inner half of the feeder drive guard.
5.
Loosen the jam nuts on the gear reducer torque arm and adjust the turnbuckle so that the belts can be removed.
Remove the belts.
6.
Remove the junction box cover on the electric motor. Label the electrical wires and disconnect the three power
wires and the ground. Disconnect the ground strap from the electric motor to the frame.
7.
Remove the four bolts holding the electric motor to the base.