TM 5-3895-374-24-24.Position the electric motor on the frame and install the fasteners. The ground strap must be reinstalled tothe motor.5.Connect the wiring in the junction box following the markings made during the disassembly of the motor.Place the cover on the junction box.6.Install the inner half of the drive guard. Install the sheaves on the motor and the pump according to theinstructions in Section 3-7-16.7.Install the drive belts and tension by sliding the electric motor away from the transfer pump. Tighten thebolts in the motor base.8.Install the outer drive guard.9.Remove padlock from the breaker and turn breaker on.3-7-14 Calibration Tank/SystemInspection. See figure 3-50.The asphalt calibration tank requires a minimal amount of maintenance. The components are installed and removed asnecessary during the asphalt calibration procedure.A.Inspection1.Inspect the electrical cable and the load cell for damage. A damaged cable will not provide an accuratereading. Repair or replace the cable and/or the load cell as necessary.2.Inspect the chains and links on which the tank is suspended. Replace these if they are damaged.3.Inspect the tank. If a large build up of asphalt has accumulated inside the tank, steam clean the tank toremove the build up. Check the support straps for cracks or damage. Repair as required.4.Inspect the calibration weight supports. If these are bent, cracked or show any damage, remove theweights and repair as required.5.Inspect the complete frame. Look for cracks, damage or bent components. Repair any damaged areas.The frame cannot contact the tank during the calibration process and therefore cannot be bent.page 3-1233
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business