TM 5-3895-374-24-2Operation ChecklistChecked For Proper Operation Of:YesNoYesNoLow water cut off( )( )Barometric damper( )( )High water cut off( )( )Boiler room combustion air and ventilation( )( )Flame safeguard control ignition failure( )( )provisions correct( )( )Flame safeguard control main flame failure( )( )Oil tank vent system checked( )( )Burner air flow switch( )( )All oil lines checked for leaks( )( )Induced draft fan controls( )( )All gas lines checked for leaks( )( )Over fire draft controls( )( )Gas lines and controls properly vented( )( )Fresh air damper end switch( )( )Other system components (specify)( )( )Notifiedof following system deficiencies:NOTES(page 3 - 994)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business