TM 5-3895-374-24-2MINIMUMPIPESIZEFORHOTOILCEI HEATER MODELS 500 800100015002000300040001. Main Lines 2"2"2"2"3" 3" 3"2. Tank Circuits 2"2"2"2"2" 2" 2"3. Asphalt Pumps 1"1"1"1"1" 1" 1"4. Asphalt Plant 1"1"1"1½" 1½" 1½" 1½"5. Hot Oil Jumper Lines 1"1"1"1"1" 1"1"PIPECAPACITIES-GALLONSPERFOOTPipe Size1" 1½" 2"2½" 3"3½"4"Gal. Per Foot.05.1017.25.38.52.66INSTALLING JACKETED PIPEIn piping for heating with oil, please keep in mind that to assure good circulation and avoid air locks, alwaysroute the piping so that the flow is into any jacket or part of system at the lowest point and out at the highestpoint. For example, a jacketed line that runs horizontally should be as shown below:page 3-924
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business