TM 5-3895-374-24-1
GP470FA
D. RECEIVING AND INSPECTION
Examine all parts to determine if there has been any damage in shipment. If equipment is to be stored prior to installation,
provide a dry storage area.
E. CONTROLLER ASS]EBLY DIMENSIONS
Fig. 2
(page 3-35)