TM 5-3895-374-1011. Four Bin Feeder Set Up Procedures(See Figures 2-1, 2-24, 2-25, 2-26, 2-27and 2-28)The Four Bin Feeder is positioned to discharge aggregate from the gathering conveyor discharge hood onto the topcenter of the scalping screen on the Feed Conveyor. See Figure 2-1 or Figure 2-2.ItemProcedure1Position the four bin feeder according to the site layout leaving it 30 feet from the feed conveyor.2Position the hydraulic power pack and connect the two hoses to the levelling jack valve.3Remove the two clips holding the wire rope (rear of the chassis) in the transport position.4Remove the four bolts (two at the top, two at the bottom) holding the gathering conveyor in the transport position.5Extend the upper hydraulic cylinders causing the gathering conveyor to swing away from thechassis.6Extend the lower hydraulic cylinders, alternate with the upper cylinders and continue until the conveyor has been fully extended.7Install conveyor locking pins on each side of the feed conveyor to hold it in the operating position.8Position the four bin feeder according to the layout. (Disconnect the hydraulic power pack if necessary.) The gathering conveyor discharge will be directly over the upper section of the screen deck.9Disconnect the transport unit from the four bin feeder.10Using a crane, remove the discharge hood from the front of the chassisand install onto the gathering conveyor.11Raise the chassis by extending the hydraulic leveling jacks.12Position the five sets of screw jacks into the operating position and install the screw jack pads.13Retract the leveling jacks until the screw jacks support the chassis. Use a four foot level to determine if the unit is level. Adjust the screw jacks as equired until the chassis is level and fully retract the levelingjacks.14Disconnect the hydraulic power pack.page 2 - 43
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business