TM 5-3895-374-24-2 4. Follow the instructions in Section 3-9-14 to join the two ends. 5. Remove padlock from the breaker and turn breaker on. 3-9-8 Gathering Conveyor Drive Removal, Repair and Replacement See figure 3-67. This procedure assumes a complete removal, repair and replacement of the assembly.  A partial disassembly repair and replacement  is  possible.    Follow  the  procedure  to  the  point  of  removing  only  those  components  requiring  repair  or replacement. If additional removal or repair is required at the head shaft, do  not  complete  the  assembly  in  this  section  until  the  other work has been completed. A. Disassembly 1. Disconnect and lock out the breaker for the gathering conveyor motor. 2. Remove the two piece guard on the belt drive (see Section 3-9-7). 3. Loosen the jam nuts on the gear reducer torque arm and adjust the turnbuckle so that the belts can be removed. Remove the belts. 4. Remove the junction box cover on the electric motor.  Label the electrical wires and disconnect the three power wires and the ground.  Disconnect the ground strap from the electric motor to the frame. 5. Remove the bolts holding the pillow block bearings on the drive shaft. 6. Remove the shaft coupling following the instructions in Section 3-9-9. 7. Remove the four bolts holding the electric motor to the base. 8. Remove the gear reducer from the head shaft following the instructions in Section 3-9-2. 9. Remove the sheaves from the drive shaft and the gear reducer following the instructions in 3-9-12. 10. Clean all components. page 3 - 1326







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.