TM 5-3895-374-24-2 4. Position the electric motor on the frame and install the fasteners.  The ground strap must be reinstalled to the motor. 5. Connect  the  wiring  in  the  junction  box  following  the  markings  made  during  the  disassembly  of  the  motor. Place the cover on the junction box. 6. Install  the  inner  half  of  the  drive  guard.    Install  the  sheaves  on  the  motor  and  the  pump  according  to  the instructions in Section 3-7-16. 7. Install  the  drive  belts  and  tension  by  sliding  the  electric  motor  away  from  the  transfer  pump.    Tighten  the bolts in the motor base. 8. Install the outer drive guard. 9. Remove padlock from the breaker and turn breaker on. 3-7-14  Calibration Tank/System Inspection.  See figure 3-50. The asphalt calibration tank requires a minimal amount of maintenance.  The components are installed and removed as necessary during the asphalt calibration procedure. A. Inspection 1. Inspect  the  electrical  cable  and  the  load  cell  for  damage.    A  damaged  cable  will  not  provide  an  accurate reading.  Repair or replace the cable and/or the load cell as necessary. 2. Inspect the chains and links on which the tank is suspended.  Replace these if they are damaged. 3. Inspect the tank.  If a large build up of asphalt has accumulated inside the tank,  steam clean the tank to remove the build up.  Check the support straps for cracks or damage.  Repair as required. 4. Inspect  the  calibration  weight  supports.    If  these  are  bent,  cracked  or  show  any  damage,  remove  the weights and repair as required. 5. Inspect the complete frame.  Look for cracks, damage or bent  components.    Repair  any  damaged  areas. The frame cannot contact the tank during the calibration process and therefore cannot be bent. page 3-1233







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.