POST INSTALLATION CEI SERVICE REQUIREMENTS
HEATER INSTALLATON CHECKLIST ITEMS - TM-5-3895-374-24-2_295

TM-5-3895-374-24-2 M081 Asphalt Mixing Plant Manual
Page Navigation
  243    244    245    246    247  248  249    250    251    252    253  
TM 5-3895-374-24-2 HEATER INSTALLATON CHECKLIST 1. Remove  all  shipping  labels,  bands  and  tape  from  the  sight  glass,  panel  box,  gauges,  thermometers, valves, etc.  and inspect for shipping damage. 2. Open the supply valve, the return valve, the by-pass valve and the suction line valve. 3. Connect the Heat Transfer Fluid supply and return lines. 4. Check the power supply for correct voltage.  Connect the power supply. 5. Grease the circulating pump with high temperature grease. 6. Fill the system with heat transfer fluid.  Refer to Section 3.3 for details. 7. Fill circulating pump bearing lubrication cavity with heat transfer oil.  Refer to Section 6.11. 8. Connect the fuel supply line(s). 9. Check the rotation of the circulating pump motor and the burner blower motor.  If both are rotating in the wrong direction, reverse any two of the incoming power leads at the main circuit breaker. 10. Start  the  burner.    SECTION  5:  BURNER  OPERATION  outlines  the  start-up  procedure  for  the  various burner types. page 3-928







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.