• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-28 Tension Wheel
Figure 2-29 Calibration Tank Position

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  69    70    71    72    73  74  75    76    77    78    79  
TM 5-3895-374-10 12.  Miscellaneous Set Up Procedures (See Figures 2-15, 2-29, 2-30, 2-31 and 2-32) Item Procedure 1 Position the calibration tank as per the site layout Figure 2-29. The valve end should be positioned toward the asphalt tanker. 2 Assemble the upper portion of the tank frame to the lower portion and install the bolts and tighten. See Figure 2-30. 3 Unbolt the lower frame from the tank and suspend the tank on the chains provided. See Figure 2-30. 4 Remove the retainer bolts holding the test weights in position. See Figure 2-30. 5 The electrical power cables can be unwrapped from their transport storage positions and connected to the control van. The cables are to run parallel to each other in straight lines. See Figure 2-31. Lay out the power cables in the following order: Surge Bin (laid out and connected during surge bin set up) Baghouse Dedrummer/Melter Asphalt Tanker Drum Mixer Feed Conveyor Four Bin Feeder 6 The electrical control cables can be unwrapped from their transport storage positions and connected to the control van. These cables are to run parallel-to each other in straight lines.  See  Figure  2-32.  Lay  out the control cables in the same order as power cables. 7 Hydraulic power pack. Store this unit on or near the goose neck of the control trailer. It may be required for re-leveling of any equipment that settles during operation. 8 Install the fines blower hose (stored in the basket on the dedrummer) from the blower on the baghouse to the drum mixer. See Figure 2-15. page 2 - 50







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.