• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-4.   Monitor/Printer Positioning
Hydraulic Power Pack Set Up Procedures

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  30    31    32    33    34  35  36    37    38    39    40  
TM 5-3895-374-10 2.Standby Generator Set Up Procedures (See Figures 2-1  and 2-6) Item Procedure 1 Position the 60 kW generator according to the site layout and not more than 50 feet away from the control van. 2 Disconnect the generator from the transport tractor. 3 Lower the three support jacks and raise the generator one to two inches. 4 Install the ground rod and connect the green wire from the rod to the ground connector on the generator. 5 Remove the power cable from the (generator trailer) storage position and connect to the generator. 6 Feed the other end of the cable through the access port in the floor of the control van (below the door).  Connect the cable to the motor control center #2 in the control van. 3.Generator Trailer Set Up Procedures (See Figures 2-1,  2-5 and 2-6) Item Procedure 1 Position the 200 kW generator according to the site layout. 2 Disconnect the generator trailer from the transport tractor. 3 Lower the four screw jacks and raise the generator one to two inches. 4 Using a four foot level,  level the trailer along both its width and length. 5 Install two ground rods (one for each generator) and connect the green wires from the rods to the ground connectors on the generators. page 2-11







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.