Screw Jacks
Figure 2-3.   Control Van

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  27    28    29    30    31  32  33    34    35    36    37  
TM 5-3895-374-10 NOTE Damaged electrical power or control cables may prevent operation of the plant. 1 Control Van Set Up Procedures (See Figures 2-3 and 2-4) Position the Control Van according to the site layout that has been determined.  This trailer is used to position the generator trailers.  Measure from the control van according to Figure 2-1 or 2-2.  Keep the Control Van parallel to both generator trailers. Item Procedure 1 Position the control van according to the site layout. 2 Disconnect the control van from the transport tractor. 3 Remove the transport strap from the two rear screw jack pads.  Lower all screw jacks. 4 Raise the trailer on the jacks approximately one inch. 5 Using a four foot level,  level the trailer along both its width and length. 6 Install the ground rod and connect to the van. 7 Install the access stairs.  The stairs are stored on the goose neck of the trailer during transportation.  Unbolt the stairs,  use a fork lift to remove and place in position below the door. 8 The computer,  monitor,  keyboard and printer are stored for transport.  Remove them from their boxes and install them by connecting them to the computer and 110 volt power outlet. 9 Remove the transport cover from the environmental control unit (ECU). 10 Install the air filter element into the ECU. page 2--8







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.