• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 3-2. Operation PMCS
Table 3-3 Movement PMCS - TM-5-3895-374-10_182

TM-5-3895-374-10 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Page Navigation
  166    167    168    169    170  171  172    173    174    175    176  
TM 5-3895-374-10 I B D A Assembly Inspection Not Ready If Not Mission T E U F Capable If E F R T M O I E R N R E G 101 * Ground cable secure 102 * Complete PMCS for generator - see generator manual 103 * Tow Dolly Tow dolly secure 104 * Hydraulic Hydraulic power pack Power Pack oil level 3-2.2. Movement PMCS NOTE The (After) Operation PMCS and Tear Down Procedures should be completed prior to the performance of this Movement PMCS. CAUTION All aggregate, mix or fuel should be removed from the equipment prior to transport. Table 3-3 Movement PMCS I B D A Assembly Inspection Not Ready If Not Mission T E U F Capable If E F R T M O I E R N R E G 1 * Control Van Tires for air pressure and damage page 3 - 21







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.